Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
786
matching recommendationsNAICS | 33351 | Metalworking Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0050 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20 | $47 | n/a |
MU0050 # 09 Y:2024 | 09 | 2024 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $540 | $2,466 | n/a |
MU0050 # 07 Y:2024 | 07 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,230 | $0 | n/a |
MU0050 # 08 Y:2024 | 08 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $6,301 | $10,644 | n/a |
MU0050 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,560 | $2,073 | n/a |
MU0050 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $98 | $320 | n/a |
MU0050 # 02 Y:2024 | 02 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $45,726 | $23,976 | n/a |
MU0050 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,159 | $262 | n/a |
MU0050 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $732 | $435 | n/a |
WM0213 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $2,965 | $267 | n/a |
WM0213 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,049 | $125 | n/a |
WM0213 # 04 Y:2024 | 04 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,240 | $2,590 | n/a |
WM0213 # 02 Y:2024 | 02 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $3,521 | $16,500 | n/a |
WM0213 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $463 | $1,730 | n/a |
WM0213 # 01 Y:2024 | 01 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,341 | $20,389 | n/a |
NL0080 # 09 Y:2023 | 09 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $171 | $80 | Implemented |
NL0080 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $186 | $420 | Implemented |
NL0080 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,163 | $4,000 | Implemented |
NL0080 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,846 | $4,160 | Implemented |
NL0080 # 07 Y:2023 | 07 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $423 | $844 | Implemented |
NL0080 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,690 | $38,085 | Not Implemented |
NL0080 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $754 | $660 | Implemented |
NL0080 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,794 | $120 | Implemented |
NL0080 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $761 | $560 | Not Implemented |
MU0026 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,370 | $6,347 | Implemented |