IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 33351 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0115 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $1,893 $10,137 Not Implemented
CW0115 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $233 $22 Implemented
CW0115 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $333 $90 Implemented
CW0115 # 05 Y:2020 05 2020 RECOVER AND REUSE COOLING WATER $3,922 $10,595 Not Implemented
CW0115 # 06 Y:2020 06 2020 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $28 $188 Implemented
CW0115 # 07 Y:2020 07 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $221 $250 Not Implemented
CW0115 # 08 Y:2020 08 2020 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,017 $10,620 Implemented
CW0115 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $1,350 Not Implemented
GT0948 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $722 $1,492 Implemented
GT0948 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $59,987 $503,684 Not Implemented
GT0948 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,214 $12,496 Implemented
GT0948 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $8,479 $4,145 Implemented
GT0948 # 03 Y:2020 03 2020 AIR CONDITION ONLY SPACE NECESSARY $6,270 $2,979 Implemented
GT0948 # 02 Y:2020 02 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,998 $2,000 Implemented
GT0948 # 01 Y:2020 01 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,480 $2,300 Implemented
CW0112 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,912 $330 Implemented
CW0112 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,658 $100 Implemented
CW0112 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,643 $848 Not Implemented
CW0112 # 04 Y:2020 04 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,678 $800 Implemented
CW0112 # 05 Y:2020 05 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,268 $3,429 Not Implemented
CW0112 # 06 Y:2020 06 2020 TREAT AND REUSE RINSE WATERS $15,861 $10,000 Implemented
CW0112 # 07 Y:2020 07 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,966 $800 Implemented
CW0112 # 08 Y:2020 08 2020 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $7,871 $14,588 Not Implemented
CW0112 # 09 Y:2020 09 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $51,045 $2,000 Implemented
CW0112 # 10 Y:2020 10 2020 INCREASE USE OF AUTOMATION $749,435 $60,000 Implemented