Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
188
matching recommendationsNAICS | 333511 | Industrial Mold Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0080 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $761 | $560 | Not Implemented |
NL0080 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $186 | $420 | Implemented |
NL0080 # 09 Y:2023 | 09 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $171 | $80 | Implemented |
NL0080 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,846 | $4,160 | Implemented |
NL0080 # 07 Y:2023 | 07 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $423 | $844 | Implemented |
NL0080 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,690 | $38,085 | Not Implemented |
NL0080 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,794 | $120 | Implemented |
NL0080 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,163 | $4,000 | Implemented |
NL0080 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $754 | $660 | Implemented |
TR0041 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,679 | $3,857 | Implemented |
TR0041 # 03 Y:2022 | 03 | 2022 | UPGRADE OBSOLETE EQUIPMENT | $17,496 | $200,000 | Implemented |
TR0041 # 02 Y:2022 | 02 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $28,659 | $27,941 | Implemented |
LS2305 # 02 Y:2023 | 02 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,419 | $7,350 | Implemented |
LS2305 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $808 | $90 | Implemented |
LS2305 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,787 | $2,315 | Implemented |
LS2305 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $752 | $900 | Implemented |
CW0115 # 07 Y:2020 | 07 | 2020 | INSTALL SPECTRAL REFLECTORS / DELAMP | $221 | $250 | Not Implemented |
CW0115 # 08 Y:2020 | 08 | 2020 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,017 | $10,620 | Implemented |
CW0115 # 06 Y:2020 | 06 | 2020 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $28 | $188 | Implemented |
CW0115 # 05 Y:2020 | 05 | 2020 | RECOVER AND REUSE COOLING WATER | $3,922 | $10,595 | Not Implemented |
CW0115 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $333 | $90 | Implemented |
CW0115 # 03 Y:2020 | 03 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $233 | $22 | Implemented |
CW0115 # 02 Y:2020 | 02 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,893 | $10,137 | Not Implemented |
CW0115 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $186 | $1,350 | Not Implemented |
NL0042 # 03 Y:2019 | 03 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,000 | $800 | Not Implemented |