Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsNAICS | 333511 | Industrial Mold Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0409 # 12 Y:2010 | 12 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $544 | $690 | Not Implemented |
WV0409 # 11 Y:2010 | 11 | 2010 | USE OPTIMUM THICKNESS INSULATION | $1,139 | $625 | Not Implemented |
WV0409 # 10 Y:2010 | 10 | 2010 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $1,165 | $400 | Not Implemented |
WV0409 # 09 Y:2010 | 09 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,292 | $3,520 | Implemented |
WV0409 # 08 Y:2010 | 08 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,480 | $0 | Implemented |
WV0409 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,490 | $600 | Implemented |
WV0409 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,693 | $985 | Not Implemented |
WV0409 # 05 Y:2010 | 05 | 2010 | RECOVER MECHANICAL ENERGY | $2,064 | $1,000 | Not Implemented |
WV0409 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $3,087 | $625 | Implemented |
WV0409 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,475 | $2,838 | Implemented |
WV0409 # 02 Y:2010 | 02 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,013 | $7,800 | Not Implemented |
WV0409 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,346 | $55,900 | Not Implemented |
UD0775 # 02 Y:2008 | 02 | 2008 | INSTALL AUTOMATIC STACK DAMPER | $650 | $400 | Implemented |
UD0775 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $690 | $2,738 | Implemented |
UD0775 # 03 Y:2008 | 03 | 2008 | INSULATE BARE EQUIPMENT | $507 | $130 | Not Implemented |
UD0775 # 04 Y:2008 | 04 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $416 | $0 | Not Implemented |
UD0775 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $343 | $300 | Implemented |
UD0775 # 06 Y:2008 | 06 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $180 | $0 | Not Implemented |
UD0775 # 07 Y:2008 | 07 | 2008 | INSTALL SKYLIGHTS | $101 | $2,200 | Not Implemented |
UD0775 # 08 Y:2008 | 08 | 2008 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $95 | $0 | Implemented |
UD0775 # 09 Y:2008 | 09 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $82 | $0 | Implemented |
WV0357 # 09 Y:2007 | 09 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $1,019 | $175 | Implemented |
WV0357 # 13 Y:2007 | 13 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $546 | $25 | Implemented |
WV0357 # 12 Y:2007 | 12 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $581 | $125 | Implemented |
WV0357 # 11 Y:2007 | 11 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $630 | $0 | Not Implemented |