IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 333511 Industrial Mold Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0626 # 02 Y:2007 02 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $6,543 $8,000 Not Implemented
MA0626 # 03 Y:2007 03 2007 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $5,346 $0 Not Implemented
MA0626 # 04 Y:2007 04 2007 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $3,465 $2,500 Not Implemented
MA0626 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,602 $5,481 Not Implemented
MA0626 # 06 Y:2007 06 2007 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $395 $200 Not Implemented
MA0626 # 01 Y:2007 01 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $67,278 $157,500 Not Implemented
WV0357 # 13 Y:2007 13 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $546 $25 Implemented
WV0357 # 12 Y:2007 12 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $581 $125 Implemented
WV0357 # 11 Y:2007 11 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $630 $0 Not Implemented
WV0357 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $656 $130 Implemented
WV0357 # 09 Y:2007 09 2007 DEVELOP A REPAIR/REPLACE POLICY $1,019 $175 Implemented
WV0357 # 08 Y:2007 08 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,455 $2,800 Not Implemented
WV0357 # 07 Y:2007 07 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,629 $1,601 Implemented
WV0357 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,725 $625 Not Implemented
WV0357 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,672 $5,600 Not Implemented
WV0357 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,910 $2,990 Not Implemented
WV0357 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $4,383 $1,405 Implemented
WV0357 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,371 $12,336 Not Implemented
WV0357 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,751 $30,100 Not Implemented