IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
NAICS 333515 Cutting Tool and Machine Tool Accessory Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0608 # 02 Y:2012 02 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $90,500 $180,000 Not Implemented
AM0608 # 03 Y:2012 03 2012 RECOVER AND REUSE WASTE MATERIAL $144,150 $85,000 Implemented
AM0608 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,200 $124,000 Implemented
AM0608 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $12,691 $3,566 Not Implemented
AM0608 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,360 $65 Not Implemented
AM0608 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,900 $1,625 Implemented
AM0608 # 01 Y:2012 01 2012 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,383,679 $251,064 Implemented
TA0067 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,940 $200 Implemented
TA0067 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,910 $0 Implemented
TA0067 # 08 Y:2003 08 2003 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $3,960 $2,510 Implemented
TA0067 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,240 $0 Implemented
TA0067 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,970 $13,700 Not Implemented
TA0067 # 05 Y:2003 05 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,185 $485 Implemented
TA0067 # 04 Y:2003 04 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $7,485 $480 Implemented
TA0067 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $8,675 $0 Not Implemented
TA0067 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,210 $400 Not Implemented
TA0067 # 01 Y:2003 01 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,270 $-19,270 Implemented