IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 3336 Engine, Turbine, and Power Transmission Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1070 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,329 $0 Implemented
OK1070 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,014 $990 Implemented
OK1070 # 04 Y:2022 04 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,689 $3,294 Not Implemented
OK1070 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $2,659 $8,954 Implemented
OK1070 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,927 $3,985 Not Implemented
OK1070 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,761 $4,884 Not Implemented
OK1070 # 08 Y:2022 08 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,533 $440 Not Implemented
OK1070 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $2,809 $9,600 Not Implemented
OK1023 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,874 $15,402 Not Implemented
OK1023 # 05 Y:2020 05 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $415 $538 Not Implemented
OK1023 # 04 Y:2020 04 2020 USE RADIANT HEATER FOR SPOT HEATING $915 $3,252 Not Implemented
OK1023 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $464 $1,236 Not Implemented
OK1023 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,606 $4,736 Not Implemented
OK1023 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $770 $0 Not Implemented
OK0816 # 07 Y:2011 07 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,005 $315,900 Not Implemented
OK0816 # 08 Y:2011 08 2011 REPLACE BOILER $26,135 $24,220 Implemented
OK0816 # 09 Y:2011 09 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,244 $11,700 Not Implemented
OK0816 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,037 $0 Implemented
OK0816 # 11 Y:2011 11 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,760 $1,338 Implemented
OK0816 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $1,893 $2,263 Not Implemented
OK0816 # 06 Y:2011 06 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $13,197 $9,150 Not Implemented
OK0816 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $17,462 $0 Not Implemented
OK0816 # 04 Y:2011 04 2011 DISCONNECT BALLASTS $481 $921 Not Implemented
OK0816 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $391 $456 Implemented
OK0816 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $1,488 Implemented