IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

530

matching recommendations
Reset
NAICS 3336 Engine, Turbine, and Power Transmission Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0560 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $812 $300 Not Implemented
NC0560 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $519 $521 Implemented
NC0560 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $474 $455 Implemented
NC0560 # 12 Y:2016 12 2016 USE PHOTOCELL CONTROLS $194 $250 Implemented
NC0560 # 13 Y:2016 13 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,597 $500 Implemented
NC0560 # 14 Y:2016 14 2016 DEVELOP A REPAIR/REPLACE POLICY $2,514 $5,865 Implemented
NC0560 # 15 Y:2016 15 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,030 $200 Not Implemented
MZ0191 # 01 Y:2015 01 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,108 $26,750 Not Implemented
MZ0191 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,902 $0 Implemented
MZ0191 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,474 $3,500 Not Implemented
MZ0191 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,535 $920 Not Implemented
MZ0191 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,229 $3,500 Not Implemented
MZ0191 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,328 $2,000 Not Implemented
MZ0191 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,548 $22,425 Not Implemented
MZ0191 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,458 $0 Implemented
AM0686 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $9,770 $0 Not Implemented
AM0686 # 02 Y:2015 02 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,790 $0 Not Implemented
AM0686 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $5 Not Implemented
AM0686 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,390 $5,700 Not Implemented
AM0686 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $455 $220 Not Implemented
AM0686 # 06 Y:2015 06 2015 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $12,685 $17,600 Not Implemented
AM0686 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,490 $500 Not Implemented
AM0686 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,915 $1,810 Not Implemented
AM0686 # 09 Y:2015 09 2015 PAY UTILITY BILLS ON TIME $1,789 $0 Not Implemented
UD0932 # 01 Y:2015 01 2015 ISOLATE HOT OR COLD EQUIPMENT $99,668 $17,675 Implemented