IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

548

matching recommendations
Reset
NAICS 33361 Engine, Turbine, and Power Transmission Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0329 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,268 $0 Implemented
WV0329 # 10 Y:2005 10 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $799 $299 Implemented
WV0329 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $732 $294 Implemented
IA0368 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $1,065 Implemented
IA0368 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,794 $53,000 Not Implemented
IA0368 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,778 $3,095 Not Implemented
IA0368 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,898 $31,761 Not Implemented
IA0368 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,048 $1,694 Not Implemented
IA0368 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,100 $6,924 Not Implemented
UU0072 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $17,050 $21,660 Not Implemented
UU0072 # 02 Y:2004 02 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,670 $10,000 Not Implemented
UU0072 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,150 $17,500 Not Implemented
UU0072 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,450 $8,500 Not Implemented
UU0072 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $940 $600 Not Implemented
UU0072 # 06 Y:2004 06 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $203,380 $800,000 Not Implemented
UU0072 # 07 Y:2004 07 2004 REPROCESS SPENT OILS ON SITE FOR RE-USE $34,700 $6,000 Not Implemented
UU0063 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $9,695 $28,050 Not Implemented
UU0063 # 02 Y:2004 02 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,316 $6,000 Not Implemented
UU0063 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,810 $5,100 Not Implemented
UU0063 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $385 Not Implemented
UU0063 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,551 $860 Not Implemented
UU0063 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,486 $0 Not Implemented
UU0063 # 07 Y:2004 07 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,123 $360 Not Implemented
LE0190 # 01 Y:2004 01 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $65,403 $20,000 Implemented
LE0190 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,844 $50,000 Not Implemented