IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 33361 Engine, Turbine, and Power Transmission Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0265 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,567 $5,100 Implemented
IC0265 # 02 Y:2022 02 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $705 $304 Implemented
IC0265 # 04 Y:2022 04 2022 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $19,650 $2,435 Not Implemented
IC0265 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,312 $7,533 Implemented
IC0245 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,465 $4,250 Implemented
IC0245 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $23,890 $13,698 Implemented
IC0245 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $575 $517 Implemented
IC0245 # 04 Y:2020 04 2020 CHECK FOR ACCURACY OF UTILITY / POWER METERS $4,231 $0 Implemented
IC0245 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $801 Implemented
BD0388 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,581 $1,200 Not Implemented
BD0388 # 01 Y:2011 01 2011 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,465 $60,000 Not Implemented
BD0388 # 05 Y:2011 05 2011 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $63,847 $26,000 Not Implemented
BD0388 # 03 Y:2011 03 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,470 $4,000 Not Implemented
BD0388 # 02 Y:2011 02 2011 USE RADIANT HEATER FOR SPOT HEATING $30,750 $20,000 Not Implemented
BD0254 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,675 $700 Implemented
BD0254 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $589 $1,023 Not Implemented
BD0254 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,567 $521 Implemented
BD0254 # 02 Y:2004 02 2004 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $6,110 $38,400 Not Implemented
BD0254 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,778 $6,000 Implemented
BD0254 # 14 Y:2004 14 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,800 $2,000 Not Implemented
BD0254 # 10 Y:2004 10 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $766 $0 Implemented
BD0254 # 13 Y:2004 13 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,580 $240 Implemented
BD0254 # 11 Y:2004 11 2004 INSTALL OCCUPANCY SENSORS $681 $1,350 Not Implemented
BD0254 # 06 Y:2004 06 2004 USE SYNTHETIC LUBRICANT $2,104 $700 Implemented
BD0254 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $826 $1,514 Not Implemented