Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2004 |
Principal Product | Wheels, Bearings & Ball Transfers for Conveyors |
NAICS | 333613 - Mechanical Power Transmission Equipment Manufacturing |
SIC | 3568 - Power Transmission Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 84,000 |
Annual Production | 20,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $239,986 | 4,786,269 | kWh | $0.05 |
Electricity Demand | $48,032 | 11,495 | kW-months/year | $4.18 |
Natural Gas | $353,642 | 66,858 | MMBtu | $5.29 |
TOTAL ENERGY COSTS | $654,096 | |||
RECOMMENDED SAVINGS* | $39,595 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,861 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,778 Cost: $6,000 |
$6,763 | 184,279 | $1,481 | 354 | - | - | - | - | $268 | - | $266 | - | - | - |
$6,763 184,279 kWh |
$1,481 354 kW-months/year |
- - MMBtu |
- - lb |
$268 - $ |
$266 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER |
Savings: $6,110 Cost: $38,400 |
- | - | - | - | $6,110 | 1,155 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,110 1,155 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $4,567 Cost: $521 |
$2,711 | 73,846 | $1,586 | 379 | - | - | - | - | $114 | - | $156 | - | - | - |
$2,711 73,846 kWh |
$1,586 379 kW-months/year |
- - MMBtu |
- - lb |
$114 - $ |
$156 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,675 Cost: $700 |
$2,219 | 60,480 | $1,456 | 349 | - | - | - | - | - | - | - | - | - | - |
$2,219 60,480 kWh |
$1,456 349 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,728 Cost: $2,885 |
$2,188 | 59,603 | $540 | 129 | - | - | - | - | - | - | - | - | - | - |
$2,188 59,603 kWh |
$540 129 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $2,104 Cost: $700 |
$1,426 | 38,860 | $678 | 162 | - | - | - | - | - | - | - | - | - | - |
$1,426 38,860 kWh |
$678 162 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,257 Cost: $1,000 |
$1,257 | 34,260 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,257 34,260 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,134 Cost: $3,500 |
- | - | - | - | $1,134 | 214 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,134 214 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $826 Cost: $1,514 |
$663 | 18,086 | $163 | 39 | - | - | - | - | - | - | - | - | - | - |
$663 18,086 kWh |
$163 39 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $766 Cost: - |
$462 | 12,577 | $304 | 73 | - | - | - | - | - | - | - | - | - | - |
$462 12,577 kWh |
$304 73 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $681 Cost: $1,350 |
$358 | 9,745 | $247 | 59 | - | - | - | - | $7 | - | $69 | - | - | - |
$358 9,745 kWh |
$247 59 kW-months/year |
- - MMBtu |
- - lb |
$7 - $ |
$69 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $589 Cost: $1,023 |
$265 | 7,221 | $170 | 41 | - | - | - | - | $66 | - | $88 | - | - | - |
$265 7,221 kWh |
$170 41 kW-months/year |
- - MMBtu |
- - lb |
$66 - $ |
$88 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $2,580 Cost: $240 |
- | - | - | - | - | - | $2,580 | 99,600 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,580 99,600 lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $3,800 Cost: $2,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $3,800 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$3,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,595 Cost: $59,833 |
$18,312 | 498,957 | $6,625 | 1,585 | $7,244 | 1,369 | $2,580 | 99,600 | $455 | - | $579 | - | $3,800 | - | $18,312 498,957 kWh |
$6,625 1,585 kW-months/year |
$7,244 1,369 MMBtu |
$2,580 99,600 lb |
$455 - $ |
$579 - $ |
$3,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,861 Cost: $12,661 |
$14,838 | 404,302 | $5,505 | 1,317 | $1,134 | 214 | $2,580 | 99,600 | $382 | - | $422 | - | - | - | $14,838 404,302 kWh |
$5,505 1,317 kW-months/year |
$1,134 214 MMBtu |
$2,580 99,600 lb |
$382 - $ |
$422 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | One-time Revenue or Avoided Cost |