IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
Reset
NAICS 33361 Engine, Turbine, and Power Transmission Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0271 # 01 Y:2003 01 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,523 $50 Implemented
NC0271 # 02 Y:2003 02 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,935 $4,065 Not Implemented
NC0271 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,792 $27,000 Not Implemented
NC0271 # 04 Y:2003 04 2003 ADOPT IN-HOUSE MATERIAL GENERATION $56,248 $120,000 Not Implemented
NC0271 # 05 Y:2003 05 2003 DEVELOP A REPAIR/REPLACE POLICY $204 $150 Implemented
NC0271 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $796 $100 Implemented
NC0263 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $118,487 $500 Not Implemented
NC0263 # 02 Y:2003 02 2003 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $22,423 $10,000 Not Implemented
NC0263 # 03 Y:2003 03 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $33,114 $24,600 Not Implemented
NC0263 # 04 Y:2003 04 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $47,210 $100,000 Implemented
NC0263 # 05 Y:2003 05 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $8,768 $10,000 Not Implemented
NC0263 # 06 Y:2003 06 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $46,271 $135,400 Not Implemented
NC0263 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $556 $680 Implemented
NC0263 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $413 $240 Implemented