IAC Assessment: NC0263
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0263
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2003
Principal Product Electric generators
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales $100,000,000-$500,000,000
# of Employees 460
Plant Area (Sq.Ft.) 489,465
Annual Production 32 Pieces
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,312,466 46,665,240 kWh $0.03
Electricity Demand $844,396 141,127 kW-months/year $5.98
Electricity Fees $433 - $ -
Natural Gas $201,552 34,232 MMBtu $5.89
TOTAL ENERGY COSTS $2,358,847
RECOMMENDED SAVINGS* $277,242 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,179
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$118,487
Cost:
$500
- - $118,487 28,572 - - - - -
-
kWh
$118,487
28,572
kW-months/year
-
-
Tgal
-
-
$
02: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$22,423
Cost:
$10,000
$13,732 522,121 $8,691 1,414 - - - - $13,732
522,121
kWh
$8,691
1,414
kW-months/year
-
-
Tgal
-
-
$
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$33,114
Cost:
$24,600
$25,439 967,248 $7,675 1,414 - - - - $25,439
967,248
kWh
$7,675
1,414
kW-months/year
-
-
Tgal
-
-
$
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$47,210
Cost:
$100,000
$33,911 1,289,400 $13,299 1,842 - - - - $33,911
1,289,400
kWh
$13,299
1,842
kW-months/year
-
-
Tgal
-
-
$
05: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$8,768
Cost:
$10,000
$10,847 412,440 $4,255 589 $(-6,334) (-974,400) - - $10,847
412,440
kWh
$4,255
589
kW-months/year
$(-6,334)
(-974,400)
Tgal
-
-
$
06: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$46,271
Cost:
$135,400
$19,729 750,158 $31,206 4,634 $(-4,664) (-815,276) - - $19,729
750,158
kWh
$31,206
4,634
kW-months/year
$(-4,664)
(-815,276)
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$556
Cost:
$680
$400 15,221 $156 22 - - - - $400
15,221
kWh
$156
22
kW-months/year
-
-
Tgal
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$413
Cost:
$240
$80 3,024 $31 4 - - $302 - $80
3,024
kWh
$31
4
kW-months/year
-
-
Tgal
$302
-
$
TOTAL RECOMMENDED Savings:
$277,242
Cost:
$281,420
$104,138 3,959,612 $183,800 38,491 $(-10,998) (-1,789,676) $302 - $104,138
3,959,612
kWh
$183,800
38,491
kW-months/year
$(-10,998)
(-1,789,676)
Tgal
$302
-
$
TOTAL IMPLEMENTED Savings:
$48,179
Cost:
$100,920
$34,391 1,307,645 $13,486 1,868 - - $302 - $34,391
1,307,645
kWh
$13,486
1,868
kW-months/year
-
-
Tgal
$302
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost