Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsNAICS | 333611 | Turbine and Turbine Generator Set Units Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0965 # 10 Y:2017 | 10 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,351 | $0 | Implemented |
MI0304 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,914 | $119,809 | Implemented |
MI0304 # 02 Y:2016 | 02 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $30,447 | $53,372 | Implemented |
MI0304 # 03 Y:2016 | 03 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $16,987 | $25,335 | Not Implemented |
MI0304 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,015 | $1,700 | Implemented |
MI0304 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,470 | $43,770 | Implemented |
MI0304 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,388 | $8,320 | Implemented |
MI0304 # 07 Y:2016 | 07 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,723 | $4,691 | Not Implemented |
MI0304 # 08 Y:2016 | 08 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,720 | $2,320 | Not Implemented |
MI0304 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,968 | $7,680 | Implemented |
MI0304 # 10 Y:2016 | 10 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,936 | $2,430 | Not Implemented |
MI0304 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $1,803 | $662 | Implemented |
MI0304 # 12 Y:2016 | 12 | 2016 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,779 | $3,350 | Implemented |
MI0304 # 13 Y:2016 | 13 | 2016 | USE PHOTOCELL CONTROLS | $1,570 | $1,120 | Not Implemented |
MZ0191 # 01 Y:2015 | 01 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,108 | $26,750 | Not Implemented |
MZ0191 # 02 Y:2015 | 02 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,902 | $0 | Implemented |
MZ0191 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,474 | $3,500 | Not Implemented |
MZ0191 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,535 | $920 | Not Implemented |
MZ0191 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,229 | $3,500 | Not Implemented |
MZ0191 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,328 | $2,000 | Not Implemented |
MZ0191 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,548 | $22,425 | Not Implemented |
MZ0191 # 08 Y:2015 | 08 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,458 | $0 | Implemented |
TT0112 # 01 Y:2013 | 01 | 2013 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $4,915 | $4,690 | Not Implemented |
TT0112 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,630 | $2,600 | Implemented |
TT0112 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $145 | $700 | Implemented |