IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

125

matching recommendations
Reset
NAICS 333618 Other Engine Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0314 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $520 $775 Not Implemented
LL0314 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $291 $180 Not Implemented
LL0314 # 09 Y:2009 09 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $381 $120 Not Implemented
MI0148 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,264 $915 Not Implemented
MI0148 # 02 Y:2007 02 2007 DISCONNECT BALLASTS $5,169 $2,150 Not Implemented
MI0148 # 03 Y:2007 03 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,272 $10,200 Not Implemented
MI0148 # 04 Y:2007 04 2007 INSTALL SKYLIGHTS $5,197 $16,736 Not Implemented
MI0148 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,440 $1,074 Not Implemented
MI0148 # 06 Y:2007 06 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,961 $3,010 Not Implemented
MI0148 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,128 $1,423 Not Implemented
MI0148 # 08 Y:2007 08 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $452 $160 Not Implemented
WI0510 # 01 Y:2006 01 2006 INSTALL TIMERS AND/OR THERMOSTATS $12,014 $0 Implemented
WI0510 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,865 $2,000 Not Implemented
WI0510 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,944 $23,000 Implemented
WI0510 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,554 $1,000 Not Implemented
WI0510 # 05 Y:2006 05 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $32,657 $3,352 Not Implemented
WI0510 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,135 $640 Implemented
WI0510 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $443 $438 Not Implemented
WI0510 # 08 Y:2006 08 2006 INSTALL SET-BACK TIMERS $340 $100 Implemented
LE0190 # 01 Y:2004 01 2004 $65,403 $20,000 Implemented
LE0190 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,844 $50,000 Not Implemented
LE0190 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,450 $2,500 Not Implemented
LE0190 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,412 $750 Not Implemented
LE0190 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,074 $218 Implemented
LE0190 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,187 $33,512 Implemented