Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0275 # 06 Y:2022 | 06 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $3,488 | $9,000 | Implemented |
TT0275 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,633 | $2,905 | Implemented |
TT0219 # 09 Y:2019 | 09 | 2019 | APPLY FOR INVESTMENT INCENTIVES | $1,440 | $0 | Implemented |
TT0219 # 08 Y:2019 | 08 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,757 | $16,291 | Implemented |
TT0219 # 03 Y:2019 | 03 | 2019 | USE OPTIMUM THICKNESS INSULATION | $27,754 | $105,000 | Implemented |
TT0219 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $50,161 | $360 | Implemented |
TT0219 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $53,170 | $61,967 | Implemented |
TT0197 # 03 Y:2017 | 03 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $31,640 | $150 | Implemented |
TT0075 # 05 Y:2011 | 05 | 2011 | INSTALL COMMON HEADER ON COMPRESSORS | $44,869 | $32,200 | Implemented |
TT0075 # 08 Y:2011 | 08 | 2011 | ISOLATE HOT OR COLD EQUIPMENT | $1,379 | $2,500 | Implemented |
TT0075 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,771 | $1,152 | Implemented |
TT0075 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,146 | $5,000 | Implemented |
TT0075 # 04 Y:2011 | 04 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,202 | $14,000 | Implemented |
TT0075 # 03 Y:2011 | 03 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $47,625 | $21,000 | Implemented |
TT0073 # 01 Y:2011 | 01 | 2011 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $13,566 | $9,650 | Implemented |
TT0059 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,600 | $38,200 | Implemented |
TT0059 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,400 | $5 | Implemented |
TT0059 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,900 | $1,800 | Implemented |
TT0059 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,100 | $205,600 | Implemented |
TT0054 # 06 Y:2010 | 06 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $410 | $50 | Implemented |
TT0054 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,240 | $4,000 | Implemented |
TT0054 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,700 | $4,500 | Implemented |
TT0054 # 03 Y:2010 | 03 | 2010 | OPTIMIZE PLANT POWER FACTOR | $18,350 | $20,000 | Implemented |
TT0054 # 02 Y:2010 | 02 | 2010 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $23,040 | $10,000 | Implemented |
TT0054 # 01 Y:2010 | 01 | 2010 | REDUCE VENTILATION AIR | $204,750 | $50,000 | Implemented |