Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
NAICS 3339 Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0896 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $6,653 $1,751 Implemented
OK0896 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,242 $1,588 Not Implemented
OK0896 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,435 $16,592 Not Implemented
OK0896 # 07 Y:2014 07 2014 INSTALL TIMERS AND/OR THERMOSTATS $746 $169 Implemented
OK0896 # 06 Y:2014 06 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $13,523 $7,700 Not Implemented
OK0896 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,702 $400 Implemented
OK0859 # 14 Y:2013 14 2013 REDUCE HEAT GAIN BY WINDOW TINTING $372 $0 Implemented
OK0859 # 01 Y:2013 01 2013 USE EXISTING DAM TO GENERATE ELECTRICITY $12,404 $65,000 Not Implemented
OK0859 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,187 $7,856 Implemented
OK0859 # 03 Y:2013 03 2013 DISCONNECT BALLASTS $342 $900 Not Implemented
OK0859 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $232 $975 Not Implemented
OK0859 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $327 $2,550 Not Implemented
OK0859 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $3,000 Implemented
OK0859 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,135 $3,356 Not Implemented
OK0859 # 08 Y:2013 08 2013 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $20,774 $7,707 Not Implemented
OK0859 # 09 Y:2013 09 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,338 $4,600 Not Implemented
OK0859 # 10 Y:2013 10 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,170 $30,000 Implemented
OK0859 # 11 Y:2013 11 2013 INSTALL SET-BACK TIMERS $1,753 $460 Not Implemented
OK0859 # 12 Y:2013 12 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,487 $3,063 Not Implemented
OK0859 # 13 Y:2013 13 2013 REDUCE HEAT GAIN BY WINDOW TINTING $3,200 $6,500 Implemented
OK0812 # 10 Y:2011 10 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,148 $7,130 Not Implemented
OK0812 # 08 Y:2011 08 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,925 $14,300 Implemented
OK0812 # 06 Y:2011 06 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $12,936 $21,477 Not Implemented
OK0812 # 05 Y:2011 05 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $13,390 $7,255 Not Implemented
OK0812 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $11,401 $77,770 Not Implemented