IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 3339 Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0484 # 07 Y:2019 07 2019 BURN A LESS EXPENSIVE GRADE OF FUEL $87,917 $290,000 Implemented
LE0484 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,879 $51,500 Implemented
LE0484 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,805 $5,500 Implemented
LE0484 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,910 $23,990 Implemented
LE0484 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,670 $2,500 Implemented
LE0484 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $7,603 $0 Implemented
LE0484 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $5,873 $6,000 Implemented
DL0110 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,943 $644 Not Implemented
DL0110 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,991 $152 Not Implemented
DL0110 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $24,800 Not Implemented
DL0110 # 04 Y:2013 04 2013 REDUCE VENTILATION AIR $4,577 $102 Not Implemented
DL0110 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $10,321 $35,000 Not Implemented
DL0110 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $6,320 $260 Implemented
DL0110 # 01 Y:2013 01 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,313 $39,750 Not Implemented
LE0281 # 12 Y:2008 12 2008 INSTALL OCCUPANCY SENSORS $3,557 $780 Not Implemented
LE0281 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,106 $34,067 Not Implemented
LE0281 # 10 Y:2008 10 2008 USE SYNTHETIC LUBRICANT $508 $500 Not Implemented
LE0281 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $120 Not Implemented
LE0281 # 08 Y:2008 08 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $696 $800 Not Implemented
LE0281 # 07 Y:2008 07 2008 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $831 $1,200 Not Implemented
LE0281 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $923 $240 Implemented
LE0281 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,306 $1,000 Not Implemented
LE0281 # 04 Y:2008 04 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,441 $2,500 Implemented
LE0281 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,659 $5,000 Not Implemented
LE0281 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,477 $1,790 Implemented