Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0396 # 02 Y:2009 | 02 | 2009 | CONDENSE OPERATION INTO ONE BUILDING | $31,185 | $13,100 | Not Implemented |
NC0396 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,090 | $83,137 | Not Implemented |
NC0396 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $600 | $558 | Not Implemented |
NC0396 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $313 | $132 | Not Implemented |
NC0396 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,507 | $0 | Not Implemented |
NC0396 # 07 Y:2009 | 07 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,690 | $5,306 | Not Implemented |
NC0396 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $76,612 | $275,318 | Not Implemented |
UD0793 # 12 Y:2009 | 12 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $435 | $0 | Not Implemented |
UD0793 # 11 Y:2009 | 11 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $621 | $1,000 | Implemented |
UD0793 # 10 Y:2009 | 10 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,256 | $4,820 | Not Implemented |
UD0793 # 09 Y:2009 | 09 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $0 | Implemented |
UD0793 # 08 Y:2009 | 08 | 2009 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,460 | $2,500 | Implemented |
UD0793 # 07 Y:2009 | 07 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,970 | $1,000 | Implemented |
UD0793 # 06 Y:2009 | 06 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,114 | $0 | Implemented |
UD0793 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,799 | $400 | Not Implemented |
UD0793 # 04 Y:2009 | 04 | 2009 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,855 | $0 | Implemented |
UD0793 # 03 Y:2009 | 03 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,960 | $500 | Not Implemented |
UD0793 # 02 Y:2009 | 02 | 2009 | INSULATE BARE EQUIPMENT | $6,677 | $1,000 | Implemented |
UD0793 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,450 | $25,000 | Implemented |