Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsNAICS | 33391 | Pump and Compressor Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0875 # 02 Y:2010 | 02 | 2010 | USE SYNTHETIC LUBRICANT | $4,585 | $0 | Not Implemented |
GT0875 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $899 | $1,555 | Implemented |
GT0875 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,718 | $121,175 | Implemented |
GT0875 # 05 Y:2010 | 05 | 2010 | INSTALL OCCUPANCY SENSORS | $2,340 | $2,940 | Implemented |
GT0875 # 06 Y:2010 | 06 | 2010 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $114,205 | $196,875 | Not Implemented |
GT0875 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,380 | $1,500 | Implemented |
TT0054 # 06 Y:2010 | 06 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $410 | $50 | Implemented |
TT0054 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,240 | $4,000 | Implemented |
TT0054 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,700 | $4,500 | Implemented |
TT0054 # 03 Y:2010 | 03 | 2010 | OPTIMIZE PLANT POWER FACTOR | $18,350 | $20,000 | Implemented |
TT0054 # 02 Y:2010 | 02 | 2010 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $23,040 | $10,000 | Implemented |
TT0054 # 01 Y:2010 | 01 | 2010 | REDUCE VENTILATION AIR | $204,750 | $50,000 | Implemented |
LE0297 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,239 | $1,000 | Not Implemented |
LE0297 # 08 Y:2010 | 08 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $935 | $800 | Not Implemented |
LE0297 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,807 | $55,184 | Not Implemented |
LE0297 # 10 Y:2010 | 10 | 2010 | INSTALL OCCUPANCY SENSORS | $983 | $450 | Not Implemented |
LE0297 # 06 Y:2010 | 06 | 2010 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,367 | $4,500 | Not Implemented |
LE0297 # 05 Y:2010 | 05 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $2,326 | $450 | Not Implemented |
LE0297 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,627 | $66,360 | Not Implemented |
LE0297 # 03 Y:2010 | 03 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,903 | $3,000 | Not Implemented |
LE0297 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,875 | $1,760 | Implemented |
LE0297 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,029 | $785 | Implemented |