Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
299
matching recommendationsNAICS | 333911 | Pump and Pumping Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0086 # 04 Y:2004 | 04 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,350 | $0 | Not Implemented |
TA0086 # 05 Y:2004 | 05 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,605 | $2,000 | Not Implemented |
CO0553 # 01 Y:2004 | 01 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $5,190 | $20,000 | Not Implemented |
CO0553 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,980 | $180 | Implemented |
CO0553 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,260 | $3,020 | Not Implemented |
CO0553 # 04 Y:2004 | 04 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,260 | $8,700 | Not Implemented |
CO0553 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,930 | $20,520 | Not Implemented |
CO0553 # 06 Y:2004 | 06 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,620 | $15,230 | Not Implemented |
CO0553 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $360 | $520 | Not Implemented |
WI0477 # 01 Y:2004 | 01 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,743 | $0 | Not Implemented |
WI0477 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,524 | $855 | Not Implemented |
WI0477 # 03 Y:2004 | 03 | 2004 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $2,765 | $605 | Not Implemented |
WI0477 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,817 | $433 | Not Implemented |
WI0477 # 05 Y:2004 | 05 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $923 | $0 | Not Implemented |
WI0477 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $938 | $0 | Implemented |
WI0477 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $582 | $0 | Not Implemented |
LL0168 # 01 Y:2003 | 01 | 2003 | USE PHOTOCELL CONTROLS | $8,239 | $1,196 | Not Implemented |
LL0168 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,916 | $900 | Not Implemented |
LL0168 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,845 | $4,800 | Implemented |
LL0168 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $5,699 | $280 | Not Implemented |
LL0168 # 05 Y:2003 | 05 | 2003 | USE PHOTOCELL CONTROLS | $1,257 | $1,784 | Not Implemented |
LL0168 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $981 | $20 | Not Implemented |
LL0168 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $488 | $240 | Implemented |
LL0168 # 08 Y:2003 | 08 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,146 | $1,157 | Implemented |