IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 33392 Material Handling Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0457 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $415 $525 Implemented
NC0457 # 03 Y:2012 03 2012 LOWER CEILING TO REDUCE CONDITIONED SPACE $19,472 $40,000 Not Implemented
NC0457 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $508 $400 Implemented
NC0457 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,516 $0 Implemented
NC0457 # 06 Y:2012 06 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,161 $2,000 Not Implemented
NC0457 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,926 $7,711 Implemented
NC0396 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,507 $0 Not Implemented
NC0396 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,690 $5,306 Not Implemented
NC0396 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $313 $132 Not Implemented
NC0396 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $600 $558 Not Implemented
NC0396 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,090 $83,137 Not Implemented
NC0396 # 02 Y:2009 02 2009 CONDENSE OPERATION INTO ONE BUILDING $31,185 $13,100 Not Implemented
NC0396 # 01 Y:2009 01 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $76,612 $275,318 Not Implemented
NC0286 # 01 Y:2004 01 2004 ADD ADDITIONAL PRODUCTION SHIFT $130,000 $20,000 Not Implemented
NC0286 # 02 Y:2004 02 2004 REDUCE VENTILATION AIR $12,177 $35,730 Implemented
NC0286 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,904 $100 Implemented
NC0286 # 04 Y:2004 04 2004 UPGRADE CONTROLS ON COMPRESSORS $1,892 $2,000 Implemented
NC0286 # 05 Y:2004 05 2004 UPGRADE CONTROLS ON COMPRESSORS $1,512 $4,600 Not Implemented
NC0286 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,566 $6,500 Not Implemented
NC0286 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $175 $169 Implemented
NC0286 # 08 Y:2004 08 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,019 $100 Not Implemented
NC0286 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $247 $191 Implemented
NC0286 # 10 Y:2004 10 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $61 $70 Not Implemented