IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 33392 Material Handling Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0696 # 01 Y:2015 01 2015 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,880 $30,000 Not Implemented
AM0696 # 02 Y:2015 02 2015 MODIFY WORKLOAD $8,280 $0 Not Implemented
AM0696 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,810 $28,220 Implemented
AM0696 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,720 $3,060 Not Implemented
AM0696 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $280 $630 Implemented
AM0696 # 06 Y:2015 06 2015 INSTALL EFFICIENT RECTIFIERS $375 $2,000 Not Implemented
AM0696 # 05 Y:2015 05 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $870 $0 Implemented
AM0696 # 08 Y:2015 08 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $130 $0 Implemented
IP0046 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,302 $64 Not Implemented
IP0046 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $122 $117 Not Implemented
IP0046 # 01 Y:2015 01 2015 UPGRADE OBSOLETE EQUIPMENT $1,665 $4 Not Implemented
IP0046 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,526 $4,032 Not Implemented
IP0046 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $348 $512 Not Implemented
IP0046 # 06 Y:2015 06 2015 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $6,619 $10,141 Not Implemented
IA0536 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,348 $332 Implemented
IA0536 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,930 $2,873 Implemented
IA0536 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,490 $6,563 Implemented
IA0536 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,942 $244 Implemented
IA0536 # 06 Y:2015 06 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,368 $4,943 Not Implemented
IA0536 # 08 Y:2015 08 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $271 $780 Not Implemented
IA0536 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,311 $480 Not Implemented
IA0536 # 03 Y:2015 03 2015 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,197 $20,000 Not Implemented
AM0677 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,805 $23 Not Implemented
AM0677 # 05 Y:2015 05 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,875 $3,000 Implemented
AM0677 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,433 $469 Implemented