IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
NAICS 333922 Conveyor and Conveying Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1018 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,691 $60,951 Not Implemented
OK1018 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,409 $4,914 Not Implemented
OK1018 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,577 $0 Not Implemented
OK1018 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,422 $870 Not Implemented
OK1018 # 06 Y:2019 06 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $547 $0 Not Implemented
OK1018 # 07 Y:2019 07 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $507 $219 Not Implemented
OK1018 # 08 Y:2019 08 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,546 $0 Not Implemented
OK1018 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $44,286 $21,990 Not Implemented
WV0575 # 09 Y:2019 09 2019 MINIMIZE WATER USAGE $510 $1,400 Not Implemented
WV0575 # 08 Y:2019 08 2019 DEVELOP A REPAIR/REPLACE POLICY $576 $558 Implemented
WV0575 # 07 Y:2019 07 2019 RECYCLE WHITE WATER $674 $2,000 Not Implemented
WV0575 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $715 $1,275 Not Implemented
WV0575 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $940 $70 Implemented
WV0575 # 04 Y:2019 04 2019 INSTALL SET-BACK TIMERS $1,692 $105 Implemented
WV0575 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,872 $896 Implemented
WV0575 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $2,374 $8,525 Not Implemented
WV0575 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,365 $5,150 Not Implemented