IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 33399 All Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0823 # 05 Y:2012 05 2012 USE HEAT PUMP FOR SPACE CONDITIONING $139,115 $1,292,500 Not Implemented
OK0823 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $5,300 $16,148 Implemented
OK0823 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $922 $2,975 Implemented
OK0823 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,396 $2,500 Not Implemented
OK0823 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,696 $22,166 Not Implemented
OK0815 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,341 $930 Implemented
OK0815 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $3,531 $633 Implemented
OK0815 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,335 $20,544 Not Implemented
OK0815 # 07 Y:2011 07 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $15,876 $3,096 Not Implemented
OK0815 # 06 Y:2011 06 2011 DISCONNECT BALLASTS $849 $696 Not Implemented
OK0815 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $2,608 $2,198 Not Implemented
OK0815 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $950 Implemented
OK0815 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,351 $0 Implemented
OK0815 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $57,281 $13,000 Not Implemented
OK0794 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,132 $75,405 Implemented
OK0794 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $380 $2,280 Not Implemented
OK0794 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $841 Implemented
OK0794 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $653 $3,006 Not Implemented
OK0794 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $4,978 Not Implemented
OK0794 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,300 $68,625 Not Implemented
OK0794 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,034 $12,733 Not Implemented
OK0794 # 03 Y:2010 03 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $10,317 $159,840 Not Implemented
OK0794 # 02 Y:2010 02 2010 INSTALL SET-BACK TIMERS $2,786 $3,239 Not Implemented