Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 33399 | All Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0715 # 09 Y:2005 | 09 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $20,968 | $0 | Not Implemented |
OK0715 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,111 | $918 | Not Implemented |
OK0715 # 01 Y:2005 | 01 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,938 | $3,936 | Not Implemented |
OK0715 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,522 | $5,175 | Not Implemented |
OK0715 # 04 Y:2005 | 04 | 2005 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $804 | $1,825 | Not Implemented |
OK0715 # 06 Y:2005 | 06 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,022 | $608 | Not Implemented |
OK0715 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,665 | $47,100 | Not Implemented |
OK0715 # 07 Y:2005 | 07 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $472 | $1,000 | Not Implemented |
OK0715 # 08 Y:2005 | 08 | 2005 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,361 | $26,590 | Not Implemented |
GT0802 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,780 | $5,000 | Implemented |
GT0802 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,100 | $0 | Implemented |
GT0802 # 05 Y:2005 | 05 | 2005 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,820 | $60 | Not Implemented |
GT0802 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,610 | $6,510 | Implemented |
GT0802 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,610 | $2,800 | Not Implemented |
GT0802 # 02 Y:2005 | 02 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $18,100 | $10,800 | Implemented |
GT0802 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $220 | $300 | Implemented |
UD0716 # 08 Y:2005 | 08 | 2005 | COVER OPEN TANKS | $2,599 | $0 | Not Implemented |
UD0716 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $507 | $0 | Not Implemented |
UD0716 # 07 Y:2005 | 07 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $2,750 | $0 | Not Implemented |
UD0716 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,922 | $1,440 | Implemented |
UD0716 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,088 | $0 | Not Implemented |
UD0716 # 04 Y:2005 | 04 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $8,151 | $3,200 | Not Implemented |
UD0716 # 03 Y:2005 | 03 | 2005 | REVISE SMOKE CLEANUP FROM OPERATIONS | $38,756 | $150,000 | Not Implemented |
UD0716 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,047 | $65,800 | Implemented |
UD0716 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $72,768 | $0 | Not Implemented |