IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 333997 Scale and Balance Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0506 # 07 Y:2017 07 2017 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $60,000 $55,338 Not Implemented
UF0506 # 06 Y:2017 06 2017 INSTALL SET-BACK TIMERS $1,014 $667 Implemented
UF0506 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,010 $6,500 Not Implemented
UF0506 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,070 $1,171 Not Implemented
UF0506 # 03 Y:2017 03 2017 INSTALL COMMON HEADER ON COMPRESSORS $4,067 $3,216 Not Implemented
UF0506 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,519 $1,169 Implemented
UF0506 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,263 $5,454 Not Implemented
UD0758 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,028 $36,900 Not Implemented
UD0758 # 13 Y:2007 13 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $320 $200 Not Implemented
UD0758 # 12 Y:2007 12 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $430 $0 Implemented
UD0758 # 10 Y:2007 10 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $876 $144 Implemented
UD0758 # 01 Y:2007 01 2007 REDUCE VENTILATION AIR $24,896 $0 Implemented
UD0758 # 03 Y:2007 03 2007 USE POWER DURING OFF-PEAK PERIODS $12,438 $0 Not Implemented
UD0758 # 04 Y:2007 04 2007 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $10,225 $15,000 Not Implemented
UD0758 # 05 Y:2007 05 2007 USE MINIMUM SAFE OVEN VENTILATION $9,717 $595 Not Implemented
UD0758 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,786 $0 Not Implemented
UD0758 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,657 $0 Implemented
UD0758 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,876 $2,500 Implemented
UD0758 # 09 Y:2007 09 2007 OPTIMIZE PLANT POWER FACTOR $992 $3,000 Not Implemented
UD0758 # 11 Y:2007 11 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $538 $0 Not Implemented
UM0253 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,527 $19,692 Implemented
UM0253 # 02 Y:2004 02 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,810 $3,150 Implemented
UM0253 # 03 Y:2004 03 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,558 $750 Implemented
UM0253 # 04 Y:2004 04 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,806 $9,583 Implemented
UM0253 # 05 Y:2004 05 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,055 $1,229 Not Implemented