Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
41
matching recommendationsNAICS | 333999 | All Other Miscellaneous General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0793 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,450 | $25,000 | Implemented |
UD0793 # 02 Y:2009 | 02 | 2009 | INSULATE BARE EQUIPMENT | $6,677 | $1,000 | Implemented |
UD0793 # 03 Y:2009 | 03 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,960 | $500 | Not Implemented |
UD0793 # 04 Y:2009 | 04 | 2009 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,855 | $0 | Implemented |
UD0793 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,799 | $400 | Not Implemented |
UD0793 # 06 Y:2009 | 06 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,114 | $0 | Implemented |
UD0793 # 07 Y:2009 | 07 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,970 | $1,000 | Implemented |
UD0793 # 08 Y:2009 | 08 | 2009 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,460 | $2,500 | Implemented |
UD0793 # 09 Y:2009 | 09 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $0 | Implemented |
UD0793 # 10 Y:2009 | 10 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,256 | $4,820 | Not Implemented |
UD0793 # 12 Y:2009 | 12 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $435 | $0 | Not Implemented |
UD0752 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,592 | $0 | Implemented |
UD0752 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,557 | $0 | Implemented |
UD0752 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,798 | $225 | Implemented |
UD0752 # 02 Y:2006 | 02 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,542 | $0 | Implemented |
UD0752 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,473 | $40,463 | Implemented |