Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsNAICS | 334 | Computer and Electronic Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0667 # 05 Y:2011 | 05 | 2011 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,023 | $250 | Implemented |
MA0667 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,246 | $3,000 | Not Implemented |
MA0667 # 07 Y:2011 | 07 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,047 | $17,500 | Not Implemented |
MA0667 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,129 | $6,340 | Not Implemented |
MA0667 # 09 Y:2011 | 09 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,515 | $4,000 | Not Implemented |
MA0667 # 10 Y:2011 | 10 | 2011 | INSTALL AUTOMATIC STACK DAMPER | $729 | $180 | Implemented |
MA0667 # 11 Y:2011 | 11 | 2011 | INSULATE BARE EQUIPMENT | $525 | $550 | Not Implemented |
MA0667 # 12 Y:2011 | 12 | 2011 | INSULATE BARE EQUIPMENT | $98 | $201 | Not Implemented |
MA0666 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $550 | $200 | Not Implemented |
MA0666 # 03 Y:2010 | 03 | 2010 | ADD AREA LIGHTING SWITCHES | $1,900 | $500 | Implemented |
MA0666 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,085 | $8,685 | Not Implemented |
MA0666 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,146 | $5,990 | Not Implemented |
MA0640 # 03 Y:2008 | 03 | 2008 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,640 | $43,000 | Not Implemented |
MA0640 # 01 Y:2008 | 01 | 2008 | REDUCE VENTILATION AIR | $36,692 | $39,000 | Implemented |
MA0640 # 02 Y:2008 | 02 | 2008 | OPTIMIZE PLANT POWER FACTOR | $11,811 | $11,850 | Implemented |
MA0640 # 04 Y:2008 | 04 | 2008 | MINIMIZE WATER USAGE | $4,210 | $18,000 | Not Implemented |
MA0640 # 05 Y:2008 | 05 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $1,895 | $3,000 | Implemented |
MA0640 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $977 | $0 | Implemented |
MA0640 # 07 Y:2008 | 07 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $644 | $689 | Implemented |
MA0612 # 06 Y:2007 | 06 | 2007 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $16,924 | $3,200 | Not Implemented |
MA0612 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $96,635 | $175,500 | Not Implemented |
MA0612 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $57,921 | $108,000 | Not Implemented |
MA0612 # 03 Y:2007 | 03 | 2007 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $23,433 | $12,750 | Not Implemented |
MA0612 # 04 Y:2007 | 04 | 2007 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $21,000 | $73,760 | Not Implemented |
MA0612 # 05 Y:2007 | 05 | 2007 | REDUCE VENTILATION AIR | $17,480 | $8,040 | Not Implemented |