IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,718

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0228 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,427 $2,500 Implemented
LE0228 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,503 $100 Implemented
LE0228 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $988 $1,700 Implemented
LE0228 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $315 $750 Not Implemented
LE0228 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,856 $43,904 Not Implemented
AM0503 # 01 Y:2006 01 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $16,230 $33,000 Not Implemented
AM0503 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,600 $500 Implemented
AM0503 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $6,550 $17,100 Not Implemented
AM0503 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,320 $300 Implemented
AM0503 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $27 Implemented
AM0503 # 06 Y:2006 06 2006 REUSE RAGS UNTIL COMPLETELY SOILED $880 $0 Not Implemented
AM0503 # 07 Y:2006 07 2006 USE SYNTHETIC LUBRICANT $256 $0 Not Implemented
WI0503 # 01 Y:2005 01 2005 $47,772 $9,625 Not Implemented
WI0503 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,209 $21,960 Not Implemented
WI0503 # 03 Y:2005 03 2005 USE OPTIMUM THICKNESS INSULATION $8,005 $7,500 Not Implemented
WI0503 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,112 $1,000 Not Implemented
WI0503 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,506 $0 Not Implemented
WI0503 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,350 $640 Not Implemented
WI0503 # 07 Y:2005 07 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,742 $4,900 Not Implemented
UU0088 # 01 Y:2005 01 2005 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $51,720 $68,760 Not Implemented
UU0088 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $703 $6,400 Not Implemented
UU0088 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,915 $900 Not Implemented
UU0088 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $17,670 $19,930 Not Implemented
UU0088 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,940 $30,000 Not Implemented
UU0088 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $15,260 $13,990 Not Implemented