IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2312 # 07 Y:2023 07 2023 SHADE WINDOWS FROM SUMMER SUN $7,159 $34,500 n/a
UL2312 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $18,666 $224,516 n/a
UL2312 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $167 $488 n/a
UL2312 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,248 $1,620 n/a
UL2312 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $0 n/a
UL2312 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,419 $15,000 n/a
UL2312 # 01 Y:2023 01 2023 INSTALL SPECTRAL REFLECTORS / DELAMP $5,925 $0 n/a
UK1409 # 10 Y:2014 10 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,187 $2,400 Not Implemented
UK1409 # 11 Y:2014 11 2014 ELIMINATE/REDUCE AN OPERATION $27,643 $9,000 Not Implemented
UK1409 # 01 Y:2014 01 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $27,758 $15,880 Not Implemented
UK1409 # 09 Y:2014 09 2014 INSULATE BARE EQUIPMENT $10,898 $18,400 Not Implemented
UK1409 # 08 Y:2014 08 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $33,225 $3,000 Not Implemented
UK1409 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,648 $16,700 Not Implemented
UK1409 # 06 Y:2014 06 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,197 $0 Not Implemented
UK1409 # 05 Y:2014 05 2014 COMBINE UTILITY METERS $2,250 $831 Not Implemented
UK1409 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,815 $2,358 Not Implemented
UK1409 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,135 $456 Not Implemented
UK1409 # 02 Y:2014 02 2014 OPTIMIZE PLANT POWER FACTOR $13,858 $7,731 Not Implemented