IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0220 # 07 Y:2023 07 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,578 $0 Not Implemented
DL0220 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,418 $0 Not Implemented
DL0220 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,704 $0 Not Implemented
DL0220 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,928 $0 Not Implemented
DL0220 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,020 $0 Not Implemented
DL0220 # 02 Y:2023 02 2023 USE OPTIMUM TEMPERATURE $6,980 $0 Implemented
DL0220 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $84,324 $0 Implemented
DL0220 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,694 $0 Not Implemented
DL0220 # 11 Y:2023 11 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,387 $6,500 Not Implemented
DL0220 # 09 Y:2023 09 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,332 $20,000 Not Implemented
DL0220 # 10 Y:2023 10 2023 RECOVER WASTE HEAT FROM EQUIPMENT $6,153 $9,740 Not Implemented
DL0220 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,150 $8,994 Implemented
DL0203 # 12 Y:2022 12 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,363 $3,109 Implemented
DL0203 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,224 $0 Implemented
DL0203 # 09 Y:2022 09 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $508 $1,000 Implemented
DL0203 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $4,027 $31,018 Not Implemented
DL0203 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,561 $0 Not Implemented
DL0203 # 10 Y:2022 10 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,239 $3,000 Not Implemented
DL0203 # 07 Y:2022 07 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $567 $0 Implemented
DL0203 # 11 Y:2022 11 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,145 $39 Not Implemented
DL0203 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,119 $145 Not Implemented
DL0203 # 02 Y:2022 02 2022 USE OPTIMUM TEMPERATURE $309 $0 Not Implemented
DL0203 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88 $117 Implemented
DL0203 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $179 $0 Not Implemented
DL0149 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,290 $29,215 Not Implemented