IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0361 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,278 $17,214 Implemented
MI0361 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,880 $1,446 Not Implemented
MI0361 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,145 $1,980 Implemented
MI0361 # 02 Y:2019 02 2019 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $18,921 $27,048 Not Implemented
MI0361 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $17,548 $3,600 Implemented
MI0361 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,647 $100,030 Implemented
MI0361 # 05 Y:2019 05 2019 AIR CONDITION ONLY SPACE NECESSARY $5,773 $9,476 Not Implemented
MI0361 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,612 $160 Implemented
SU0489 # 02 Y:2019 02 2019 REDUCE VENTILATION AIR $6,410 $1,802 Not Implemented
SU0489 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,470 $31,423 Not Implemented
SU0489 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $435 $828 Not Implemented
SU0489 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $765 $110 Implemented
SU0489 # 05 Y:2019 05 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $299 $968 Not Implemented
SU0489 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $118 $396 Not Implemented
SD0589 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,426 $8,840 Implemented
SD0589 # 03 Y:2019 03 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $242 $120 Implemented
SD0589 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $442 $0 Implemented
SD0588 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,578 $7,495 Implemented
SD0588 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $407 $0 Implemented
SD0588 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $812 $1,395 Implemented
SD0588 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,633 $32,287 Implemented
AS0477 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,264 $3,590 Implemented
AS0477 # 01 Y:2019 01 2019 ADOPT IN-HOUSE MATERIAL GENERATION $718,945 $688,982 Not Implemented
AS0477 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,100 $7,907 Implemented
AS0477 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,747 $120,000 Implemented