IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163

matching recommendations
Reset
NAICS 3342 Communications Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0039 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $330 $128 Not Implemented
IP0039 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,314 $1,524 Not Implemented
IP0039 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,262 $3,790 Not Implemented
IP0039 # 06 Y:2015 06 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,679 $6,839 Not Implemented
UK1409 # 01 Y:2014 01 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $27,758 $15,880 Not Implemented
UK1409 # 02 Y:2014 02 2014 OPTIMIZE PLANT POWER FACTOR $13,858 $7,731 Not Implemented
UK1409 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,135 $456 Not Implemented
UK1409 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,815 $2,358 Not Implemented
UK1409 # 05 Y:2014 05 2014 COMBINE UTILITY METERS $2,250 $831 Not Implemented
UK1409 # 06 Y:2014 06 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,197 $0 Not Implemented
UK1409 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,648 $16,700 Not Implemented
UK1409 # 08 Y:2014 08 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $33,225 $3,000 Not Implemented
UK1409 # 09 Y:2014 09 2014 INSULATE BARE EQUIPMENT $10,898 $18,400 Not Implemented
UK1409 # 10 Y:2014 10 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,187 $2,400 Not Implemented
UK1409 # 11 Y:2014 11 2014 ELIMINATE/REDUCE AN OPERATION $27,643 $9,000 Not Implemented
CO0693 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,130 $570 Implemented
CO0693 # 02 Y:2014 02 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,940 $6,400 Not Implemented
CO0693 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,450 $50,000 Implemented
CO0693 # 04 Y:2014 04 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,260 $1,250 Implemented
AM0645 # 01 Y:2013 01 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,885 $63,000 Implemented
AM0645 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,290 $750 Implemented
AM0645 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $570 $60 Implemented
AM0645 # 04 Y:2013 04 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,070 $0 Not Implemented
AM0645 # 05 Y:2013 05 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $480 $1,000 Not Implemented
UD0864 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,307 $2,925 Implemented