Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsNAICS | 33422 | Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0631 # 06 Y:2019 | 06 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,730 | $10,000 | Not Implemented |
NC0631 # 07 Y:2019 | 07 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,724 | $100 | Not Implemented |
SD0576 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,703 | $57,500 | Implemented |
SD0576 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,047 | $900 | Not Implemented |
SD0576 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,280 | $8,325 | Not Implemented |
SD0576 # 04 Y:2019 | 04 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,774 | $5,676 | Implemented |
SD0576 # 05 Y:2019 | 05 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $587 | $1,720 | Implemented |
SD0576 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $148 | $350 | Implemented |
CO0731 # 01 Y:2016 | 01 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,470 | $1,300 | n/a |
CO0731 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,960 | $1,220 | n/a |
CO0731 # 03 Y:2016 | 03 | 2016 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $14,520 | $70,000 | n/a |
CO0731 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,890 | $16,110 | n/a |
CO0731 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,460 | $4,780 | n/a |
MI0301 # 01 Y:2016 | 01 | 2016 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $15,850 | $1,120 | Not Implemented |
MI0301 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,990 | $35,099 | Implemented |
MI0301 # 03 Y:2016 | 03 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,246 | $2,379 | Not Implemented |
MI0301 # 04 Y:2016 | 04 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,075 | $18,626 | Not Implemented |
MI0301 # 05 Y:2016 | 05 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,096 | $322 | Not Implemented |
MI0301 # 06 Y:2016 | 06 | 2016 | USE OPTIMUM THICKNESS INSULATION | $2,946 | $2,710 | Not Implemented |
MI0301 # 07 Y:2016 | 07 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,197 | $2,146 | Not Implemented |
MI0301 # 08 Y:2016 | 08 | 2016 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $1,288 | $8,881 | Implemented |
MI0301 # 09 Y:2016 | 09 | 2016 | INSTALL OCCUPANCY SENSORS | $1,252 | $2,200 | Implemented |
MI0301 # 10 Y:2016 | 10 | 2016 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $580 | $3,880 | Not Implemented |
MI0301 # 11 Y:2016 | 11 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $540 | $280 | Implemented |
UK1409 # 01 Y:2014 | 01 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $27,758 | $15,880 | Not Implemented |