IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0203 # 12 Y:2022 12 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,363 $3,109 Implemented
MA0831 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $247,461 $2,531,558 Not Implemented
MA0831 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,697 $25,920 Not Implemented
MA0831 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,489 $9,040 Implemented
MA0831 # 04 Y:2022 04 2022 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $42,140 $270,000 Not Implemented
MA0831 # 05 Y:2022 05 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $41,831 $1,000 Implemented
MA0831 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,808 $21,525 Not Implemented
MA0831 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,657 $42,058 Implemented
MA0831 # 08 Y:2022 08 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,654 $15,630 Not Implemented
MA0831 # 09 Y:2022 09 2022 INSULATE FEEDWATER TANK $798 $1,376 Implemented
SF0574 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $6,067 $5,306 Implemented
SF0574 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,180 $4,064 Not Implemented
SF0574 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,332 $38,413 Implemented
SF0574 # 04 Y:2021 04 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $96,904 $419,477 Implemented
SF0574 # 05 Y:2021 05 2021 REDUCE DELIVERY SCHEDULES $19,915 $56,589 Implemented
NL0059 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,547 $51,468 Implemented
NL0059 # 02 Y:2021 02 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $8,198 $50,347 Not Implemented
NL0059 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $702 $4,153 Not Implemented
NL0059 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $479 $500 Implemented
NL0059 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $1,350 Not Implemented
NL0059 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $139 $220 Not Implemented
OR0741 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,176 $40,448 Not Implemented
OR0741 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $56,371 $0 Not Implemented
OR0741 # 03 Y:2021 03 2021 USE HEAT PUMP FOR SPACE CONDITIONING $25,522 $19,860 Not Implemented
AM0824 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,660 $4,400 Implemented