IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0510 # 02 Y:2017 02 2017 USE OPTIMUM TEMPERATURE $1,757 $0 Not Implemented
UF0510 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $1,142 $225 Not Implemented
UF0510 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $908 $689 Implemented
UF0510 # 05 Y:2017 05 2017 AUTOMATE FINISHING PROCESS $84,346 $5,030 Implemented
UF0510 # 06 Y:2017 06 2017 INSTALL EQUIPMENT TO MOVE PRODUCT $944,640 $126,336 Implemented
AS0439 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $629 $650 Not Implemented
AS0439 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,146 $4,770 Not Implemented
AS0439 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,293 $950 Implemented
AS0439 # 04 Y:2017 04 2017 MAINTAIN MACHINES TO REDUCE LEAKS $734 $545 Not Implemented
SD0544 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,627 $14,788 Not Implemented
SD0544 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,529 $41,589 Implemented
SD0544 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,835 $26,705 Implemented
SD0544 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,488 $8,800 Implemented
SD0544 # 05 Y:2017 05 2017 ISOLATE HOT OR COLD EQUIPMENT $5,008 $2,160 Not Implemented
SD0544 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,765 $3,500 Implemented
SD0544 # 07 Y:2017 07 2017 USE PHOTOCELL CONTROLS $3,481 $10,611 Implemented
SD0544 # 08 Y:2017 08 2017 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $2,798 $7,832 Implemented
OK0963 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,783 $62,981 Not Implemented
OK0963 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,310 $5,608 Not Implemented
OK0963 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,937 $38,220 Implemented
OK0963 # 04 Y:2017 04 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,699 $12,090 Not Implemented
OK0963 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $272 $0 Implemented
OK0963 # 06 Y:2017 06 2017 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,116 $1,182 Implemented
DL0173 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $20,880 $0 Implemented
DL0173 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,435 $15,000 Implemented