IAC logo
IAC Assessment: CL1908
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL1908
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2019
Principal Product high voltage insul & protection
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 225,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 5,920
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $680,494 9,244,204 kWh $0.07
Electricity Demand $147,721 22,382 kW-months/year $6.60
Natural Gas $12,077 1,051 MMBtu $11.49
TOTAL ENERGY COSTS $874,531
RECOMMENDED SAVINGS* $61,091 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,237
Cost:
$41,608
$23,514 317,757 $4,723 716 - - $23,514
317,757
kWh
$4,723
716
kW-months/year
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,401
Cost:
$5,725
$8,661 117,046 $1,740 264 - - $8,661
117,046
kWh
$1,740
264
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,809
Cost:
$11,080
$14,281 192,992 $2,528 391 - - $14,281
192,992
kWh
$2,528
391
kW-months/year
-
-
$
04: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$1,156
Cost:
-
$1,156 16,517 - - - - $1,156
16,517
kWh
-
-
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,091
Cost:
-
$3,457 47,360 $634 96 - - $3,457
47,360
kWh
$634
96
kW-months/year
-
-
$
06: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$397
Cost:
-
- - - - $397 - -
-
kWh
-
-
kW-months/year
$397
-
$
TOTAL RECOMMENDED Savings:
$61,091
Cost:
$58,413
$51,069 691,672 $9,625 1,467 $397 - $51,069
691,672
kWh
$9,625
1,467
kW-months/year
$397
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees