IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,574

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0332 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,766 $1,320 Implemented
SU0332 # 05 Y:2013 05 2013 UPGRADE OBSOLETE EQUIPMENT $1,180 $5,512 Not Implemented
SU0332 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,516 $37,508 Not Implemented
IP0007 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,164 $0 Implemented
IP0007 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,744 $0 Implemented
IP0007 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $13,528 $33,600 Not Implemented
IP0007 # 04 Y:2013 04 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $46,311 $151,951 Not Implemented
WM0016 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,622 $488 Not Implemented
WM0016 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $652 $850 Not Implemented
WM0016 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,517 $0 Implemented
WM0016 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $957 $270 Not Implemented
WM0016 # 05 Y:2012 05 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,769 $13,000 Not Implemented
WM0016 # 06 Y:2012 06 2012 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,004 $0 Implemented
WM0016 # 07 Y:2012 07 2012 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $962 $5,000 Not Implemented
WM0012 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,304 $1,675 Not Implemented
WM0012 # 02 Y:2012 02 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,345 $375 Not Implemented
WM0012 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $771 $100 Not Implemented
WM0012 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,999 $5,230 Implemented
WM0012 # 05 Y:2012 05 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,779 $4,500 Not Implemented
WM0012 # 06 Y:2012 06 2012 AIR CONDITION ONLY SPACE NECESSARY $597 $975 Not Implemented
WM0012 # 07 Y:2012 07 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $62 $128 Implemented
DL0096 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,429 $30,095 Implemented
DL0096 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,176 $8,000 Implemented
DL0096 # 03 Y:2012 03 2012 KEEP EQUIPMENT CLEAN $2,296 $1,200 Implemented
DL0096 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,791 $500 Implemented