IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0699 # 05 Y:2012 05 2012 USE HEAT PUMP FOR SPACE CONDITIONING $1,250 $6,500 Implemented
MA0699 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $706 $100 Implemented
MAS028 # 01 Y:2012 01 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $37,819 $31,800 Implemented
MAS028 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $22,269 $9,650 Not Implemented
MAS028 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,815 $4,000 Implemented
MAS028 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,781 $0 Not Implemented
MAS028 # 05 Y:2012 05 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,762 $5,000 Implemented
MAS025 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $50,701 $22,000 Not Implemented
MAS025 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $11,105 $10,770 Not Implemented
MAS025 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,097 $0 Not Implemented
MAS025 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $5,622 $935 Not Implemented
MAS025 # 05 Y:2012 05 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,171 $4,300 Implemented
MI0221 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $10,726 $1,800 Implemented
MI0221 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,561 $1,660 Implemented
MI0221 # 03 Y:2012 03 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,281 $11,600 Implemented
MI0221 # 04 Y:2012 04 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,238 $80 Implemented
MI0221 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,133 $5,826 Not Implemented
MI0221 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,479 $1,075 Implemented
MI0221 # 07 Y:2012 07 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,296 $2,784 Not Implemented
MI0221 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,022 $80 Not Implemented
MI0221 # 09 Y:2012 09 2012 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $712 $1,208 Not Implemented
MI0221 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $685 $541 Not Implemented
MI0221 # 11 Y:2012 11 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $929 $2,335 Not Implemented
BD0413 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,209 $12,000 Not Implemented
BD0413 # 02 Y:2012 02 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,063 $3,690 Not Implemented