IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0223 # 06 Y:2024 06 2024 USE PHOTOCELL CONTROLS $406 $200 n/a
WM0222 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,099 $21,586 n/a
WM0222 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,848 $12,763 n/a
WM0222 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,034 $4,262 n/a
WM0222 # 04 Y:2024 04 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,041 $0 n/a
SD0656 # 12 Y:2024 12 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,042 $11,447 n/a
SD0656 # 11 Y:2024 11 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,784 $2,109 n/a
SD0656 # 10 Y:2024 10 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,299 $3,896 n/a
SD0656 # 09 Y:2024 09 2024 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $35,678 $51,900 n/a
SD0656 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,188 $500 n/a
SD0656 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,422 $2,040 n/a
SD0656 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,164 $2,109 n/a
SD0656 # 05 Y:2024 05 2024 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $2,144 $2,200 n/a
SD0656 # 04 Y:2024 04 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $54,151 $15,130 n/a
SD0656 # 03 Y:2024 03 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $54,943 $3,087 n/a
SD0656 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $49,836 $74,485 n/a
SD0656 # 01 Y:2024 01 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,203 $18,032 n/a
AS0574 # 06 Y:2024 06 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $264 $267 n/a
AS0574 # 05 Y:2024 05 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $649 $152 n/a
AS0574 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,317 $2,384 n/a
AS0574 # 03 Y:2024 03 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,135 $501 n/a
AS0574 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,540 $1,389 n/a
AS0574 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $29,273 $271,736 n/a
AM0907 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,512 $8,350 n/a
AM0907 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $625 $240 n/a