IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,489

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0036 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,852 $0 n/a
OR0769 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,114 $0 Not Implemented
OR0769 # 01 Y:2023 01 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $3,018 $7,000 Not Implemented
OR0769 # 02 Y:2023 02 2023 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $9,780 $12,978 Not Implemented
SD0637 # 10 Y:2023 10 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $25,625 $49,475 Not Implemented
SD0637 # 09 Y:2023 09 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,900 $2,000 Not Implemented
SD0637 # 08 Y:2023 08 2023 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,662 $0 Implemented
SD0637 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $788 $1,660 Not Implemented
SD0637 # 06 Y:2023 06 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $53,597 $0 Not Implemented
SD0637 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $65,827 $115,927 Not Implemented
SD0637 # 04 Y:2023 04 2023 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,593 $8,642 Not Implemented
SD0637 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,393 $700 Implemented
SD0637 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $665 $2,159 Not Implemented
SD0637 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $283 $250 Implemented
NT0007 # 05 Y:2023 05 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,000 $7,500 Not Implemented
NT0007 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $4,290 $5,486 Not Implemented
NT0007 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,470 $0 Not Implemented
NT0007 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $63,856 $337,512 Not Implemented
NT0007 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,184 $5,993 Implemented
WM0201 # 01 Y:2023 01 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,913 $15,200 Not Implemented
WM0201 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,589 $2,500 Not Implemented
WM0201 # 03 Y:2023 03 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,633 $7,520 Not Implemented
WM0201 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,077 $1,814 Not Implemented
WM0201 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $1,042 $195 Not Implemented
WM0199 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,795 $44,389 Implemented