IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0240 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,974 $2,092 Implemented
LE0240 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,308 $2,500 Implemented
LE0240 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,178 $4,500 Implemented
LE0240 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,994 $500 Implemented
LE0240 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $331 $300 Implemented
LE0240 # 08 Y:2006 08 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $192 $300 Implemented
LE0240 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,770 $139,872 Not Implemented
OK0733 # 01 Y:2006 01 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,333 $5,000 Not Implemented
OK0733 # 02 Y:2006 02 2006 INSTALL OCCUPANCY SENSORS $6,122 $13,600 Implemented
OK0733 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,003 $980 Implemented
OK0733 # 04 Y:2006 04 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,500 $0 Not Implemented
OK0733 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,077 $9,738 Implemented
OK0733 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $1,460 $3,919 Implemented
OK0733 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $442 $1,360 Implemented
AS0426 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,102 $17,458 Not Implemented
AS0426 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,823 $500 Implemented
AS0426 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $8,267 $2,077 Implemented
AS0426 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $7,727 $5,500 Not Implemented
AS0426 # 05 Y:2006 05 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,172 $2,000 Not Implemented
AS0426 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,221 $1,000 Implemented
AS0426 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,539 $15,085 Implemented
AS0426 # 08 Y:2006 08 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,590 $20,832 Not Implemented
AS0426 # 09 Y:2006 09 2006 USE SOLAR HEAT TO HEAT WATER $3,172 $14,400 Not Implemented
WV0344 # 01 Y:2006 01 2006 DEVELOP A REPAIR/REPLACE POLICY $50,956 $1,472 Implemented
WV0344 # 02 Y:2006 02 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $41,030 $1,000 Implemented