IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0007 # 05 Y:2023 05 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,887 $50 Not Implemented
CI0007 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,123 $836 Not Implemented
CI0007 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $853 $0 Not Implemented
CI0007 # 08 Y:2023 08 2023 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $663 $0 Not Implemented
DL0220 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $84,324 $0 Implemented
DL0220 # 02 Y:2023 02 2023 USE OPTIMUM TEMPERATURE $6,980 $0 Implemented
DL0220 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,020 $0 Not Implemented
DL0220 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,928 $0 Not Implemented
DL0220 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,704 $0 Not Implemented
DL0220 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,418 $0 Not Implemented
DL0220 # 07 Y:2023 07 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,578 $0 Not Implemented
DL0220 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,694 $0 Not Implemented
DL0220 # 09 Y:2023 09 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,332 $20,000 Not Implemented
DL0220 # 10 Y:2023 10 2023 RECOVER WASTE HEAT FROM EQUIPMENT $6,153 $9,740 Not Implemented
DL0220 # 11 Y:2023 11 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,387 $6,500 Not Implemented
DL0220 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,150 $8,994 Implemented
CM1013 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $10,211 $116,226 n/a
CM1013 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,342 $3,480 n/a
CM1013 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,819 $3,590 n/a
CM1013 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $465 $260 n/a
DL0217 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,180 $0 Implemented
DL0217 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,621 $0 Implemented
DL0217 # 03 Y:2023 03 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $112,250 $0 Not Implemented
DL0217 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,120 $0 Implemented
DL0217 # 05 Y:2023 05 2023 REDUCE VENTILATION AIR $29,580 $0 Implemented