Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
112
matching recommendationsNAICS | 3344 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0433 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,142 | $7,500 | n/a |
AS0433 # 04 Y:2006 | 04 | 2006 | INSTALL EFFICIENT RECTIFIERS | $540 | $15,000 | n/a |
AS0433 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $34,471 | $30,000 | n/a |
AS0433 # 02 Y:2006 | 02 | 2006 | USE SOLAR HEAT TO HEAT WATER | $13,683 | $78,400 | n/a |
AS0432 # 03 Y:2006 | 03 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $9,888 | $3,000 | n/a |
AS0432 # 04 Y:2006 | 04 | 2006 | INSTALL EFFICIENT RECTIFIERS | $540 | $15,000 | n/a |
AS0432 # 02 Y:2006 | 02 | 2006 | USE SOLAR HEAT TO HEAT WATER | $13,683 | $78,400 | n/a |
AS0432 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $17,236 | $15,000 | n/a |
CO0591 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,430 | $200 | Implemented |
CO0591 # 03 Y:2006 | 03 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $260 | $30 | Not Implemented |
CO0591 # 07 Y:2006 | 07 | 2006 | DISCONNECT BALLASTS | $310 | $110 | Implemented |
CO0591 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $1,350 | $1,290 | Not Implemented |
CO0591 # 05 Y:2006 | 05 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,900 | $32,600 | Not Implemented |
CO0591 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,680 | $5,290 | Not Implemented |
CO0591 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $610 | $0 | Implemented |
LE0240 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,178 | $4,500 | Implemented |
LE0240 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $331 | $300 | Implemented |
LE0240 # 02 Y:2006 | 02 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $74,790 | $800 | Not Implemented |
LE0240 # 03 Y:2006 | 03 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,974 | $2,092 | Implemented |
LE0240 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,770 | $139,872 | Not Implemented |
LE0240 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,994 | $500 | Implemented |
LE0240 # 08 Y:2006 | 08 | 2006 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $192 | $300 | Implemented |
LE0240 # 01 Y:2006 | 01 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $265,405 | $500,000 | Implemented |
LE0240 # 04 Y:2006 | 04 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,308 | $2,500 | Implemented |
OK0733 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $1,460 | $3,919 | Implemented |