IAC Assessment: OK0733
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2006
Principal Product Printed Circuit Boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 88,000
Annual Production 50,000 Pieces
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,034 2,022,750 kWh $0.04
Electricity Demand $41,706 5,037 kW-months/year $8.28
Natural Gas $3,771 349 MMBtu $10.81
TOTAL ENERGY COSTS $128,511
RECOMMENDED SAVINGS* $17,937 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,104
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,333
Cost:
$5,000
- - $3,333 389 - - - - -
-
kWh
$3,333
389
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,122
Cost:
$13,600
$6,122 148,950 - - - - - - $6,122
148,950
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,003
Cost:
$980
- - - - $1,003 93 - - -
-
kWh
-
-
kW-months/year
$1,003
93
MMBtu
-
-
$
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$3,500
Cost:
-
- - - - - - $3,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,500
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,077
Cost:
$9,738
$2,077 19,219 - - - - - - $2,077
19,219
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,460
Cost:
$3,919
$1,460 35,526 - - - - - - $1,460
35,526
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$442
Cost:
$1,360
$442 4,709 - - - - - - $442
4,709
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$17,937
Cost:
$34,597
$10,101 208,404 $3,333 389 $1,003 93 $3,500 - $10,101
208,404
kWh
$3,333
389
kW-months/year
$1,003
93
MMBtu
$3,500
-
$
TOTAL IMPLEMENTED Savings:
$11,104
Cost:
$29,597
$10,101 208,404 - - $1,003 93 - - $10,101
208,404
kWh
-
-
kW-months/year
$1,003
93
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes