IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 33441 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0076 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,001 $720 Implemented
TA0076 # 06 Y:2004 06 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,680 $732 Not Implemented
TA0076 # 07 Y:2004 07 2004 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $880 $0 Not Implemented
TA0076 # 08 Y:2004 08 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $468 $0 Not Implemented
CO0552 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $47,960 $7,780 Not Implemented
CO0552 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,570 $620 Implemented
CO0552 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,520 $270 Not Implemented
CO0552 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $834 $560 Implemented
CO0552 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,500 $3,050 Implemented
CO0552 # 06 Y:2004 06 2004 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $14,250 $71,200 Not Implemented
CO0552 # 07 Y:2004 07 2004 RECOVER AND REUSE COOLING WATER $4,170 $20,000 Not Implemented
CO0552 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $950 $2,800 Not Implemented
SU0195 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,293 $0 Not Implemented
SU0195 # 02 Y:2004 02 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $333 $0 Not Implemented
SU0195 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,236 $1,380 Implemented
SU0195 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,836 $1,837 Implemented
SU0195 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,140 $555 Implemented
AS0390 # 01 Y:2004 01 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $11,500 $80 Implemented
AS0390 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,783 $400 Implemented
AS0390 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,953 $23,750 Not Implemented
AS0390 # 04 Y:2004 04 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,384 $15,950 Not Implemented
AS0390 # 05 Y:2004 05 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,779 $197 Implemented
AS0390 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,590 $230 Not Implemented
AS0390 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,263 $30 Implemented
AS0390 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $289 $450 Implemented