Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,581
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0528 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,850 | $16,010 | Not Implemented |
CO0528 # 04 Y:2003 | 04 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,000 | $3,000 | Not Implemented |
CO0528 # 05 Y:2003 | 05 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,720 | $13,150 | Not Implemented |
CO0528 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,940 | $10,310 | Not Implemented |
LM0066 # 01 Y:2004 | 01 | 2004 | INSTALL OCCUPANCY SENSORS | $670 | $68 | Not Implemented |
LM0066 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,653 | $1,794 | Not Implemented |
LM0066 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $462 | $20 | Implemented |
LM0066 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,818 | $0 | Implemented |
LM0066 # 05 Y:2004 | 05 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,443 | $102 | Not Implemented |
LM0066 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $92 | $87 | Not Implemented |
LM0066 # 07 Y:2004 | 07 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,730 | $11,000 | Not Implemented |
OR0432 # 01 Y:2003 | 01 | 2003 | RECYCLE SPENT TANNING SOLUTION | $136,000 | $280,000 | Not Implemented |
OR0432 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $25,900 | $32,000 | Implemented |
OR0432 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,830 | $1,200 | Implemented |
OR0432 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,230 | $7,640 | Implemented |
OR0432 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $8,813 | $8,813 | Not Implemented |
TA0059 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,950 | $0 | Not Implemented |
TA0059 # 02 Y:2003 | 02 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $5,536 | $500 | Not Implemented |
TA0059 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,885 | $7,671 | Implemented |
TA0059 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,890 | $200 | Implemented |
TA0059 # 05 Y:2003 | 05 | 2003 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,100 | $585 | Not Implemented |
TA0059 # 06 Y:2003 | 06 | 2003 | REPAIR FAULTY LOUVERS AND DAMPERS | $2,040 | $625 | Not Implemented |
BD0235 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,609 | $7,200 | Not Implemented |
BD0235 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $3,778 | $5,025 | Not Implemented |
BD0235 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,478 | $3,000 | Not Implemented |