Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
158
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0029 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $78 | $0 | n/a |
SJ0029 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $137,645 | $376,457 | n/a |
SJ0029 # 04 Y:2025 | 04 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,874 | $6,782 | n/a |
SJ0029 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $378 | $574 | n/a |
SJ0029 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,400 | $1,940 | n/a |
SJ0029 # 06 Y:2025 | 06 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,952 | $0 | n/a |
SD0656 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,836 | $74,485 | Not Implemented |
SD0656 # 09 Y:2024 | 09 | 2024 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $35,678 | $51,900 | Implemented |
SD0656 # 03 Y:2024 | 03 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $54,943 | $3,087 | Not Implemented |
SD0656 # 01 Y:2024 | 01 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,203 | $18,032 | Not Implemented |
SD0656 # 05 Y:2024 | 05 | 2024 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $2,144 | $2,200 | Not Implemented |
SD0656 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,164 | $2,109 | Not Implemented |
SD0656 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,422 | $2,040 | Implemented |
SD0656 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,188 | $500 | Implemented |
SD0656 # 04 Y:2024 | 04 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $54,151 | $15,130 | Not Implemented |
SD0656 # 10 Y:2024 | 10 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,299 | $3,896 | Implemented |
SD0656 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,784 | $2,109 | Not Implemented |
SD0656 # 12 Y:2024 | 12 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,042 | $11,447 | Not Implemented |
SJ0009 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $8 | $200 | Implemented |
SJ0009 # 09 Y:2024 | 09 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,761 | $2,675 | Not Implemented |
SJ0009 # 08 Y:2024 | 08 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $513 | $624 | Implemented |
SJ0009 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $67,746 | $441,525 | Not Implemented |
SJ0009 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,699 | $844 | Implemented |
SJ0009 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $764 | $32 | Implemented |
SJ0009 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $469 | $0 | Not Implemented |