IAC logo
IAC Assessment: SD0656
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0656
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2024
Principal Product Electronic Cable Connectors
NAICS 334417 - Electronic Connector Manufacturing
SIC 3678 - Electronic Connectors
Sales $10,000,000-$50,000,000
# of Employees 112
Plant Area (Sq.Ft.) 33,000
Annual Production 20,000 Units
Production Hrs. Annual 4,896
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $203,151 512,790 kWh $0.40
Electricity Demand $60,779 1,131 kW-months/year $53.72
Natural Gas $13,086 593 MMBtu $22.08
TOTAL ENERGY COSTS $325,016
RECOMMENDED SAVINGS* $242,854 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,203
Cost:
$18,032
$8,308 20,970 $4,895 91 - - $8,308
20,970
kWh
$4,895
91
kW-months/year
-
-
Tgal
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$49,836
Cost:
$74,485
$31,657 79,901 $18,179 338 - - $31,657
79,901
kWh
$18,179
338
kW-months/year
-
-
Tgal
03: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$54,943
Cost:
$3,087
$(-9,359) (-23,625) $64,302 1,197 - - $(-9,359)
(-23,625)
kWh
$64,302
1,197
kW-months/year
-
-
Tgal
04: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$54,151
Cost:
$15,130
$54,151 136,677 - - - - $54,151
136,677
kWh
-
-
kW-months/year
-
-
Tgal
05: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$2,144
Cost:
$2,200
$1,755 4,430 $389 7 - - $1,755
4,430
kWh
$389
7
kW-months/year
-
-
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,164
Cost:
$2,109
$7,423 18,737 $2,741 51 - - $7,423
18,737
kWh
$2,741
51
kW-months/year
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,422
Cost:
$2,040
$1,082 2,731 $340 6 - - $1,082
2,731
kWh
$340
6
kW-months/year
-
-
Tgal
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,188
Cost:
$500
$3,188 8,046 - - - - $3,188
8,046
kWh
-
-
kW-months/year
-
-
Tgal
09: 3.8113 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) Savings:
$35,678
Cost:
$51,900
- - - - $35,678 6,694 -
-
kWh
-
-
kW-months/year
$35,678
6,694
Tgal
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,299
Cost:
$3,896
$2,237 5,646 $1,062 20 - - $2,237
5,646
kWh
$1,062
20
kW-months/year
-
-
Tgal
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,784
Cost:
$2,109
$4,341 10,957 $1,443 27 - - $4,341
10,957
kWh
$1,443
27
kW-months/year
-
-
Tgal
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,042
Cost:
$11,447
$6,830 17,240 $2,212 41 - - $6,830
17,240
kWh
$2,212
41
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$242,854
Cost:
$186,935
$111,613 281,710 $95,563 1,778 $35,678 6,694 $111,613
281,710
kWh
$95,563
1,778
kW-months/year
$35,678
6,694
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal