Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0715 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $305 | $0 | Implemented |
AM0715 # 07 Y:2016 | 07 | 2016 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,830 | $4,560 | Implemented |
AM0715 # 06 Y:2016 | 06 | 2016 | USE OPTIMUM TEMPERATURE | $8,060 | $9,230 | Not Implemented |
AM0715 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,750 | $50 | Implemented |
AM0715 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,530 | $50,830 | Implemented |
AM0715 # 03 Y:2016 | 03 | 2016 | USE SOLAR HEAT FOR HEAT | $31,594 | $151,288 | Implemented |
AM0715 # 02 Y:2016 | 02 | 2016 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $53,960 | $0 | Not Implemented |
AM0715 # 01 Y:2016 | 01 | 2016 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $566,490 | $1,145,213 | Not Implemented |
OK0942 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $469,328 | $2,302,430 | Not Implemented |
OK0942 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $972 | $4,623 | Implemented |
OK0942 # 04 Y:2016 | 04 | 2016 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $73,902 | $31,000 | Not Implemented |
OK0942 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,283 | $8,000 | Not Implemented |
OK0942 # 05 Y:2016 | 05 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $600 | $3,450 | Implemented |
OK0942 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,767 | $3,112 | Implemented |
SU0412 # 04 Y:2016 | 04 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $98 | $78 | Not Implemented |
SU0412 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,342 | $480 | Not Implemented |
SU0412 # 05 Y:2016 | 05 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,474 | $3,632 | Not Implemented |
SU0412 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,305 | $1,707 | Not Implemented |
SU0412 # 01 Y:2016 | 01 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $154 | $0 | Not Implemented |
SU0412 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $296 | $169 | Not Implemented |
SU0412 # 09 Y:2016 | 09 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $119 | $576 | Not Implemented |
SU0412 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,742 | $6,797 | Not Implemented |
SU0412 # 07 Y:2016 | 07 | 2016 | ELIMINATE/REDUCE AN OPERATION | $5,577 | $9,195 | Not Implemented |
MI0298 # 01 Y:2016 | 01 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $34,838 | $36,314 | Implemented |
MI0298 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,220 | $1,660 | Implemented |